Tuesday, March 1, 2011
WE'RE HERE!!!!!!!!!
We're 11 days into life in our new home.......finally! More details & pictures to come!
Friday, January 28, 2011
Piece by piece.
Here's the latest progress! We're down to 2 weeks until close!
Fireplace:

Master bath coming together:

Kitchen also coming together:

Back of basement bar:

Master bedroom in NEWLY PAINTED COLOR: (yes, I changed it!)

Blurry picture of the sunroom:
Fireplace:
Master bath coming together:

Kitchen also coming together:
Back of basement bar:
Master bedroom in NEWLY PAINTED COLOR: (yes, I changed it!)
Blurry picture of the sunroom:
Tuesday, January 18, 2011
COLOR!!!
It was like a whole new house today! Color on the walls...Light fixtures...even a few appliances!
Garage lockers in:

Master bedroom painted...(Looking a little more "minty" than I had hoped...)

Master closet installed:

Wall ovens in:

Holy green playroom!

Light fixtures:

Staircase stained:

Great room ceiling fan is up!
Garage lockers in:
Master bedroom painted...(Looking a little more "minty" than I had hoped...)
Master closet installed:

Wall ovens in:

Holy green playroom!
Light fixtures:

Staircase stained:
Great room ceiling fan is up!
Monday, January 17, 2011
Coming to life!
I'm behind again, so these pics are about a week old, but I'm posting them anyway. We're heading up there again tomorrow--we shall see what new things await us then!
Kitchen cabinets being stained:


Master bathroom painted:

Garage doors on:

Last but not least...Blair's infamous bar in the basement:
Kitchen cabinets being stained:
Master bathroom painted:
Garage doors on:
Last but not least...Blair's infamous bar in the basement:
Thursday, January 6, 2011
Delay in posting...but major house progress!
The stone is on the front:

Kitchen cabinets in:


Sunroom bookshelves & window seat in:

Loft coming along:

We're getting there!
Kitchen cabinets in:

Sunroom bookshelves & window seat in:
Loft coming along:
We're getting there!
Saturday, December 25, 2010
Hardwood floors...oh my!
Due to the chaos that is our life, we haven't made it up to the house in over two weeks (gasp!), but our builder sent us a few pictures he snapped last week.
The hardwood floors on the main level should be fully installed by now:

The basement is now fully framed with the drywall ready & waiting as soon as the framing inspection clears:

Up next: cabinets! Woot!
The hardwood floors on the main level should be fully installed by now:
The basement is now fully framed with the drywall ready & waiting as soon as the framing inspection clears:
Up next: cabinets! Woot!
Thursday, December 9, 2010
Little by little.
Things are slowly taking shape inside...the moulding on the first & second floors is almost done.

The interior doors on both these floors are also done, but THEY ARE THE WRONG DOORS, so I didn't take any pictures of them. *Sigh*
Ah well....rewind & start again!
The stairway is well on its way:

It's kind of hard to see, but the shakes are now on the dormers, although they still need to be painted, so they are not final yet:

The interior doors on both these floors are also done, but THEY ARE THE WRONG DOORS, so I didn't take any pictures of them. *Sigh*
Ah well....rewind & start again!
The stairway is well on its way:
It's kind of hard to see, but the shakes are now on the dormers, although they still need to be painted, so they are not final yet: